[NukeNet] Summary of Nuclear Waste Storage Provision in the FY2007 Senate Energy and Water Appropria

Michele Boyd mboyd at citizen.org
Mon Jul 24 09:45:35 CDT 2006


I have attached the updated version.

Michele

Summary of Nuclear Waste Storage Provision in the FY2007 Senate 
Energy and Water Appropriations bill (Sec. 313 of H.R. 5427)

The Senate version of the FY2007 Energy and Water Appropriations bill
(H.R. 5427), which was passed by the Senate Energy and Water
Appropriations Committee on June 29, 2006, contains an authorizing
provision that requires states with nuclear reactors to designate at
least one site in that state for "interim" waste storage, called a
Consolidation and Preparation (CAP) facility. Tucked into a large
appropriations bill, this provision would result in a sweeping change to
the country's nuclear waste policy without hearings or public debate. 


Despite the U.S. Department of Energy's (DOE) recent claim that Yucca
Mountain will begin receiving waste in 2017, the site is unsafe for
geologic storage of nuclear waste and the program remains mired in
scientific fraud and yet another design overhaul. The safest option over
the next century is to safeguard the waste at the reactor sites.  While
the appropriations bill leaves open the possibility for existing reactor
sites to be named CAP facilities, it could actually result in an
increase in the number of sites where high-level nuclear waste is
stored, as well as needlessly increase transport risks to public health
and safety. Moving waste to yet another site in every state or to
regional sites would not eliminate waste storage at operating reactor
sites, nor improve security. This proposal would also give the DOE
authority to site waste dumps over the objections of state and local
governments.

Timeline in the Bill

The bill provides only 9 months to choose sites "interim" storage
sites, potentially in all 31 states with nuclear power reactors, and a
total of only 3.5 years for siting and licensing of those sites. 

Within 60 days of enactment: DOE must designate a Director of
Consolidation and Preparation (CAP)

Within 180 days of enactment: The CAP Director, in consultation with
the Governor of each state with nuclear power reactors, must evaluate
the "feasibility and desirability" of locating a CAP facility within
the state. The CAP Director must issue a report making recommendations
to the DOE Secretary regarding siting a CAP storage facility in each
state with nuclear power. The report must be published in the Federal
Register for public comment.

Within 90 days of the report: DOE, in consultation with the Governor of
each state with nuclear power reactors, must designate "an eligible
site" for a CAP facility within that state for spent fuel stored
within that state, unless the DOE determines that "the designation of
such a site is not feasible or desirable."  Thus, DOE could override a
state's choice for a storage site or sites. Eligible sites include
federal land or private land purchased from a willing seller. 
Ineligible sites for a CAP facility include a state designated for a
geologic repository or with an approved commercial dry cask interim
storage site, as well as locations of National Parks, Forests, Wildlife
Refuges, and BLM lands. Therefore, the most likely federal land would be
at DOE sites, which is contrary to legal agreements made with States and
tribes. DOE has committed to cleaning up these sites, not adding more
pollution to them.

Within 90 days of the report: DOE may also determine that it is in the
national interest to locate a regional CAP facility and designate an
eligible site. A regional CAP facility cannot be in a state that has a
designated state-wide CAP facility.

Within 30 days of designation of a CAP facility: DOE must submit a
license application to the Nuclear Regulatory Commission (NRC), along
with an environmental report (as required by 10 CFR 72, subpart B and 10
CFR 51, subpart A). The license is for 25 years and is nonrenewable.
This artificial limit, however, is unenforceable * by 2010, the amount
of radioactive waste produced in t
he U.S. would fill up the Yucca
Mountain site, if it is ever opened, and reprocessing is highly unlikely
to be commercialized in the next several decades, if ever.

Within 32 months after receiving an application: NRC must issue an
environmental impact statement (EIS) and grant or deny a license.

Other provisions of the bill

DOE to take title to waste at shutdown reactors
DOE is required, upon request of the owner, to take title to the waste
at the site and take responsibility for the storage of the waste at the
site "until such time as the waste can be moved to another site for
storage or disposal."

NAS conditions for safe transport not yet met
After getting a license to construct a CAP facility, DOE must take
title to the waste to be moved to that facility based upon the
Acceptance Priority Ranking (10 CFR 961). DOE must transport the waste
from the sites to the CAP facilities, subject to licensing and
regulation by the NRC and Department of Transportation under existing
law.  In a February 2006 report on the transport of spent nuclear fuel,
the National Academy of Sciences (NAS) identified several vital issues
that must be studied before any large-scale shipments of irradiated
nuclear fuel commence. 
*	The NAS recommended that "an independent examination of the
security of spent fuel and high-level waste be carried out prior to the
commencement of large-quantity shipments" [emphasis added]. 
*	The NAS "strongly" endorsed full-scale testing of waste
packages that test the performance of the casks required under current
regulations, as well as under conditions that exceed these regulations.
The NRC does not currently require full-scale testing to license a cask
design. 
*	The report concluded that "extreme accident conditions
involving very-long-duration fires could compromise" waste containers.
The committee recommended that the NRC do additional analyses of these
scenarios and "implement operational controls and restrictions" on
shipments to reduce the likelihood of conditions that would lead to such
fires. 
*	The NAS expressed concerns about the DOE's ability to plan and
manage a safe program, finding that "the challenges of sustained
implementation should not be underestimated." 

Design of CAP facilities
Design for the CAP facilities must use storage technologies that are
licensed, approved or certified by the NRC. DOE must amend the contracts
with utilities to reimburse utilities for transport storage systems
purchased by utilities if DOE determines that it is "cost effective"
to use these systems, as long as DOE does not have to spend any money
modifying those systems or to get additional regulatory approvals to use
them.

NEPA requirements
The provision defines issuance of a license as a major federal action
under NEPA. Prior to issuing a license, NRC must prepare a Final EIS,
which must analyze the impacts of transportation of waste to the CAP
facility, but can not consider the impacts of storage beyond the 25-year
license period.  Given that the waste is likely to remain at these sites
for more than 25 years, this prohibition is merely an artificial cutoff
to facilitate licensing. 

DOE's activities (including site selection, assessments, license
applications, and construction and use of a licensed CAP facility) must
be considered "preliminary decisionmaking activities" for the
purposes of judicial review.  DOE is not allowed to prepare an EIS or
any environmental review before conducting these activities.  It also
requires that judicial review of the NRC's EIS be consolidated with
the judicial review of the NRC's licensing decision.

Funding
The bill authorizes $10 million each year from FY2007 to 2011 (a total
of $50 million). Title III (page 93) appropriates $10 million in FY2007
to DOE to "promote the development of one or more" CAP facilities
that are "away from civilian nuclear reactors."

DOE is authorized to use the Nuclear Waste Fund to identify, develop,
license, construct, operate, and decommission CAP facilities, as well
 as
for transport, treating, packaging or waste to be stored at a CAP
facility.

Legislates the Waste Confidence Rule
The bill legislates that this provision and the DOE's obligation to
develop a repository "provide sufficient and independent grounds for
any further findings" by the NRC of "reasonable assurance" that
spent fuel and high level waste will be "disposed of safely and on a
timely basis for the purposes of the [NRC's] decision to grant or
amend any license to operate any civilian nuclear power reactor." This
provision is politicizing what should be a scientific and technical
determination. While it could help enable the licensing of new nuclear
power plants by preventing members of the public from raising concerns
about the waste in the licensing process, it does not change the reality
that we do not have a viable, permanent solution for nuclear waste.

Centralized "interim" storage is merely an illusion of a waste
solution. We urge Congress to reject this provision in the FY2007 Energy
and Water Appropriations bill and support onsite storage with stringent
security measures.




More information about the Nukenet mailing list