Nippon Temporarily Shut Down Because of Biomass Fuel Problems at Power Plant

- by Paul Gottlieb, February 27, 2014. Source: Peninsula Daily News

[[{"type":"media","view_mode":"media_large","fid":"170","attributes":{"alt":"","class":"media-image","style":"width: 274px; height: 222px; margin-left: 10px; margin-right: 10px; float: left;","title":"Photo: Peninsula Daily News"}}]]PORT ANGELES — Fuel-system problems with Nippon Paper Industries USA’s newly expanded biomass cogeneration plant have caused a two-week shutdown of the mill, according to a union official.

Darrel Reetz, vice president of the Association of Western Pulp & Paper Workers Local 155, said Thursday he is confident the plant will be up and running again by about March 9.

“We are having some issues that need to be fixed on the fuel system,” Reetz said.

Whole Trees 90% of Rothschild, WI Biomass Incinerator Fuel

- by Kevin Murphy, February 26, 2014. Source: Wasau Daily Herald

[[{"type":"media","view_mode":"media_large","fid":"169","attributes":{"alt":"","class":"media-image","style":"width: 333px; height: 221px; float: left; margin-left: 10px; margin-right: 10px;","title":"Photo: Corey Schjoth"}}]]The recently built power plant at Domtar paper mill is getting only 10 percent of its fuel from logging waste, which originally was supposed to supply nearly all of the plant’s energy needs.

The 50-megawatt, $255 million power plant went online in November to provide steam for Domtar’s paper operations and a clean source of power for WE Energies. The plant will burn 500,000 tons of biomass annually, said Cathy Schulze, a WE Energies spokeswoman.